Skip to content
Fort Lauderdale, FL · Licensed across FloridaMon–Fri 8:00 AM – 5:00 PM · (954) 807-3208
Romco StructuralCall

What we repair · Parking Structures

The Garage — Everyone Has to Keep Parking

Garage repairs are structurally routine and logistically miserable, because every space belongs to somebody with nowhere else to put a car.

We will turn it into a buildable scope, a phasing plan and a realistic range — so the board can decide with numbers rather than adjectives.

Not us

We do not perform the inspection. An engineer does

30/25

Years to first milestone — 25 within 3 miles of coast

Occupied

Buildings stay occupied while we work

Licensed

General contractor, licensed in the state of Florida

There is no swing space for cars

You can phase a garage into sections, but the cars in the closed section have to go somewhere. On a full building with no overflow, that means off-site parking, shuttles, or a very tightly sequenced program — and all of it needs deciding before the schedule is published, not after.

There is a second constraint that boards discover late. Overhead repair work requires the bay directly below to be closed as well, for the safety of anyone parking there, which means the number of spaces lost is larger than the number of spaces being worked on. On a garage with no spare capacity that difference can be the whole phasing plan.

What has to be resolved

  • Where displaced cars go during each phase.
  • Whether traffic can circulate through the works safely.
  • Overhead work, which usually requires the bay below to be closed.
  • Drainage, since garage slabs frequently pond and that caused the damage.
  • Traffic coatings, which protect the slab and take cure time.

Why the garage deteriorates first

A parking structure has no envelope, no conditioning and, on most levels, no roof. Rain reaches it directly, salt air reaches it directly, and chlorides tracked in on tires are deposited onto the slab every day and dissolved by the next rain into the concrete below.

It is the most exposed structure the association owns and the one nobody inspects, because it looks like infrastructure rather than like part of the building. In a coastal Florida condominium it is reliably the element that needs restoration first.

How we handle it

  1. 01Plan phasing and displaced parking with the board before publishing.
  2. 02Maintain safe circulation and pedestrian routes throughout.
  3. 03Repair concrete, treat steel, correct drainage.
  4. 04Apply traffic coating where specified, with realistic cure windows.
  5. 05Return each phase before opening the next.

Solve the parking before you sign anything. It is the single most common reason garage projects stall, and it is an association problem rather than a contractor problem — which means it needs to be resolved by the board while the schedule is still theoretical.

Said plainly

Where we stop

If there is genuinely nowhere for displaced cars to go, the project may need off-site arrangements the association has to fund. We will flag that early rather than discover it at mobilization.

FAQ

Common questions

Where do residents park?
That is the first thing to solve, and it is an association decision. Projects stall here more than anywhere.
How long is each phase closed?
Driven by repair extent and coating cure. It is published in advance so residents can plan.
Why is the garage slab damaged?
Usually ponding water and chlorides tracked in from the road. Drainage correction is part of the fix.
Is traffic coating necessary?
Where specified, yes — it protects the slab you just repaired. It also needs real cure time.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.